The walls continue to go up. Every board needs several cuts -- length, an angle on the bottom for water to drip off of, maybe a slope on the top to match the angle of the roof... and the battens need to be ripped from the 1x10 boards. Much sawing is being done! The battens are a two-person job, it would be much harder to do it solo.
Need to install battens to close up the gaps, but it's starting to feel like there are walls!
Ready to rip some more battens...
No comments:
Post a Comment